Question
A can do a piece of work in 40 days. A is 25% more
eicient than B. In how many days the work gets completed when both of them work together?Solution
Efficiency of A = 1/40 Efficiency of B = (1/40) × (1/1.25) = 1/50 Time taken by B to complete the work = 50 days Let the total amount of work = 200 units Amount of the work done by A in one day = 200/40 = 5 units Amount of the work done by B in one day = 200/50 = 4 units Time taken by both to complete the work = (200/9) days
What is the minimum limit of withdrawal that should be allowed by banks in the Basic Savings Bank Deposit Accounts?
The National Infrastructure Pipeline was launched with 6,835 infrastructure projects with a projected infrastructure investment of _________.
Which city reclaimed the third position in the GFCI 36 ranking from Singapore?
Who has the power to give directions under IFSCA Act?
Which of the following is true about SR Equity Shares (Superior Voting rights) that can be listed on stock exchange at IFSC
(i)Â Â Â Â Â Â Â Â Â ...
According to the IFSCA Circular on Sovereign Green Bonds (SGrBs) Trading and Settlement (September 2024), which of the following is responsible for hand...
Which Indian institution plays a leading role in overseeing the Sovereign Gold Bond (SGB) Scheme?
When did India International Exchange (India INX) start its operations in IFSC
Consider the following statement:
I.               157 new nursing college will be established under this.
II.   �...
Which of the following Schemes/initiatives have played major role in the inclusion of the disadvantaged groups under the formal economic net.
...