Question
What type of high-performance and costly computer can
process data for hundreds or thousands of users at the same time?Solution
Mainframes are a type of computer that generally is known for their large size, amount of storage, processing power and high level of reliability.
• They are primarily used by large organizations for mission-critical applications requiring high volumes of data processing.
• All mainframes can run or host multiple operating systems.
• They are designed to handle very high-volume input and output (I/O) and emphasize throughput computing.
• A single mainframe can replace dozens or even hundreds of smaller servers.
12 men take 6 days to complete a piece of work. They worked for a period of 2 days. After that, they were joined by 4 more men. How many more days will ...
40 tailors can stitch a batch of dresses in 30 days. If 20 tailors started the job and after 15 days ‘u’ more tailors joined them such that the rema...
Two individuals, P and Q, can complete a task in (x + 6) days and (x + 3) days, respectively. Another individual, S, is capable of completing 25% of the...
40 men can complete a piece of work in 24 days. All of them started the work together, after 6 days how much more men will be required to complete the s...
A and B can do a piece of work in 30 days and 40 days, respectively. They began the work together but after a certain time, A leaves off and B completed...
- Two pipes, A and B, can fill a tank together in 72 minutes. Both pipes are turned on at the same time. However, pipe B is turned off after 60 minutes, and ...
5 Pandavas can do a work in 18 days, 4 Kauravas can do the same work in 30 days. Now, in how many total days the total work be finished if 1 Panadva and...
A group of 24 men is capable of finishing a task in 15 days. Initially, 12 men begin the job and work on it for 12 days. After this period, an additiona...
P and Q can complete a work in 16 days and 24 days, respectively. P, Q and R together can complete the work in 8 days. If R get a total wage of Rs. 3360...
A and B together can complete a piece of work in 10 days. A alone can complete the work in 15 days. How many days will B take to complete the work alone?