Question
5 men and 3 boys together can complete a work in 16
days. 3 men and 7 boys can together complete half of the same work in 8 days. Find the time taken by 1 man and 1 boy together to complete 75% of the entire work.Solution
Let the efficiency of man and that of a boy be 'M' units/day and 'B' units/day respectively. Time taken by 3 men and 7 boys together to complete the entire work = 8 × 2 = 16 days Then, total work = (5M + 3B) × 16 = (3M + 7B) × 16 Or, 5M + 3B = 3M + 7B Or, 2M = 4B So, M : B = 2 : 1 Let 'M' = 2x and 'B' = x Then, total work = (2x × 5 + x × 3) × 16 = (10x + 3x) × 16 = 13x × 16 = 208x units 75% of the total work = 208x × 0.75 = 156x units Time taken by 1 man and 1 boy together to complete 75% of the work = 156x ÷ (2x + x) = 156 ÷ 3 = 52 days
What is the simplified value of the given expression?
4(sin² 20° + sin² 70°) + 2sin 30° - (2sec 60° + cot 45°)
If 17sin A = 8, where 0
tan 20Ëš x tan 23Ëš x tan 67Ëš x tan 70Ëš = ?
If 3 tan X + cot X = 2√3, then find the value of 6 tan2 X + 2 cot2 X.
If 2ycosθ = x sinθ and 2xsecθ – ycosecθ = 3, then x 2 + 4y 2 = ?
If (3cos A - sin A) = 2 cos (90° - A), then find the value of cot A.
- Find the maximum value of (9sin A + 12cos A).
- If 2cos²A + 3sin²A = 13/5, then find the value of (sec²A - 1)
- If sin 2a = (1/2), then find the value of (sin a + cos a).
- If sin (3A − 2B) = (√3/2) and cos (A + B) = (1/2), where 0° < A, B < 90°, then find the value of ‘A’.