Question
L completes a project in 18 days, and K completes the same
in 27 days. If J alone takes 1.3 times the time taken by L and K working together, find the number of days J will take.Solution
ATQ,
Time taken by L and K together to complete the work = (18 × 27)/ (18 + 27) = 10.8 days
Time taken by J alone to complete the work = 1.3 × 10.8 = 14.04 days
A piece of wood is held under water. The up thrust on it will be:
Starting from a stationary position, Rahul pedals his bicycle to attain a velocity of 6 ms⁻¹ in 30 s. Then he applies brakes such that the velocity o...
The seed multiplication ratio of rapeseed, red gram, hybrid maize, sorghum and jute is:
Speed of light will be maximum in which of the following mediums?
Which device is used to measure atmospheric pressure?
A current of 3 A flows through a 10-ohm resistor for 5 seconds. What is the total energy dissipated by the resistor?
Nigeria rolled out which WHO vaccine first (2025)?
The mass of a body on earth is 10 Kg, acceleration due to gravity, g (e) is 10 m/s² . If acceleration due to gravity on the moon is g (m) 6 m/s² , the...
Which vitamin deficiency is most directly associated with night blindness in humans?
The most common isotope of hydrogen is: