Question
Ajay alone can complete a work in 50 days. Vijay is four
times as efficient as Ajay. Find the percentage of work completed by Ajay and Vijay together in 10 days.Solution
ATQ,
Let the efficiency of Ajay = x units/day
Total work = 50x units
Efficiency of Vijay = x × 4 = 4x units/day
Work done by Ajay and Vijay together in 10 days = (x + 4x) × 10 = 50x units
Percentage of work done = (50x / 50x) × 100 = 100%
Which of the following statements is/are correct regarding the impact of climate change?
1. Sea-surface temperature of Indian Ocean may increase ...
Consider the following peaks:
1. Saramati
2. Nokrek
3. Makalu
4. Annapurna
5. Kamet
6. Nanda Devi...
Match the following Geographical Discoveries with their respective Discoverer.
Discovery                   ...
The Loktak Lake, on which a hydroelectric project was constructed, is situated in which state?
Which one of the following countries shares border with the least number of states/UTs of India?Â
Consider the following rivers:
1. Vamsadhara
2. Indravati
3. Pranahita
4. Pennar
Which of the above are tributaries of Godavari?
The famous Ajanta Caves are located in which Indian state?
The Nilgiri Mountain Railway connects which two towns in Tamil Nadu?
Which of the following Isopleth connects places of equal height above the sea level?
The Narmada river flows to the west, while most other large peninsular rivers flow to the east. Why?Â
1. It occupies a linear rift valley.
<...