Question
A work can be completed by βAβ and βBβ, alone in
18 days and 12 days, respectively. Find the number of days taken by βCβ to complete the same work alone if βAβ, βBβ and βCβ together can complete the whole work in 4 days.ΒSolution
Let total work = 36 units (LCM of 18 and 12) Efficiency of βAβ = (36/18) = 2 units/day Efficiency of βBβ = (36/12) = 3 units/day Combined efficiency of βAβ, βBβ and βCβ = (36/4) = 9 units/day Efficiency of βCβ = 9 β (2 + 3) = 4 units/day Required time taken = (36/4) = 9 days
Consider two concentric circles having radii 17 cm and 15 cm. What is the length (in cm) of the chord, of the bigger circle, which is a tangent to the s...
If O is the orthocentre of ΔABC , if ∠ BOC = 105 0 then what is the measure of ∠ BAC?
In the given figure CD is parallel to AB then ∠y is?

If O is circumcentre of acute angled triangle ABC, if ∠ OBC = 150 then ∠BAC = ?
- Length of a chord in a circle of radius 'r' cm, is 40 cm and distance between chord and centre of the circle is 21 cm. Find the value of (2r + 1).
The sides of a triangle are 10 cm, 17 cm, and 21 cm. Find the area of the triangle using Heronβs formula.
The radius of the incircle of a triangle is 8 cm. if the area of the triangle is 56 cm 2 , then its perimeter is?
The internal bisector of βABC at β A cuts BC on D and cuts the circumcircle at E. If DE = 6cm, AC = 8cm and AD = 10 cm, then find the length of AB?
Find the area of triangle having sides 5 m, 6 m, and 9 m.