Question
Sudhanshu completes `1/3` of work in 12 days,
then he completes the remaining work with the help of Neeraj in 4 days. The time required for Neeraj alone to complete the entire work isSolution
Sudhanshu can do 1/3rd work in 12 days So he can do total work in 36 days. They both can do remaining work (2/3) in 4 days So they can do total work in 6 days. Sudhanshu Sudhanshu+Neeraj 36 6 36 1 : 6 So neeraj 1 day work = 6 - 1 = 5 units So he can do total work in = 36/5 days
Which among the following crops is a photoperiod-sensitive crop?
The edible part of a potato plant is the modification of which part of potato plantÂ
An example for minor millet crop isÂ
 ‘Pusa Naveen’ is a variety of:
The rate of decrease of temperature with height is known as:
Which are of the following is an asymmetrical triazine?
Which type of meristem is responsible for the increase in girth or thickness of plants?
What is the primary source of silicon in soil minerals?
The system of growing same crop on same land year after year is known as:Â
Which of the following pair is not correctly matched?