Question
Sudhanshu completes `1/3` of work in 12 days,
then he completes the remaining work with the help of Neeraj in 4 days. The time required for Neeraj alone to complete the entire work isSolution
Sudhanshu can do 1/3rd work in 12 days So he can do total work in 36 days. They both can do remaining work (2/3) in 4 days So they can do total work in 6 days. Sudhanshu Sudhanshu+Neeraj 36 6 36 1 : 6 So neeraj 1 day work = 6 - 1 = 5 units So he can do total work in = 36/5 days
A mixture contains 70 litres of milk and the rest water such that the ratio of the quantity of milk to that of water in the mixture is 7:3. How many lit...
(X + 140) liters of mixture A contains milk and water only such that quantity of water in it is (X – 100) liters less than quantity of milk in it. 75%...
Milk and water are mixed in vessel A in the ratio of 5:2 and in vessel B in the ratio of 8 : 5. In what ratio should quantities be taken from the two ve...
36 liters of milk were kept in a container. 1.8 liters were removed and replaced with water. This procedure was performed one more time. How much milk d...
700 ml of a mixture contains milk and water in the ratio of 18 respectively. If 100 ml of water and 110 ml of milk are added into it, then the ratio of ...
In a mixture of 45 litres, the ratio of wine to water is 2 : 3. If this ratio is to be 1 : 3, then what is the quantity of water needed to be added?
Containers A and B hold mixtures of honey and water in the ratios of 3:2 and 9:11, respectively. If 12 liters from container A and 24 liters from contai...
A container contains Alcohol and water in ratio of 4:3 and Capacity of Container is 28 lit. If half of the Container is replaced with 25 lit of water th...
A vessel contains a mixture of milk and water in the ratio 7:2 respectively. 90 liters of the mixture is taken out of the vessel ...
When 10 litres of water is added to a mixture of milk and water, the ratio of quantity of milk and water becomes 4:5. Instead, if 20 litres of water had...