Start learning 50% faster. Sign in now
ATQ; Let the total work = 150 units (LCM of 50 and 75) Rahul’s efficiency = 150/50 = 3 units per day Karan’s efficiency = 150/75 = 2 units per day Work done by Rahul in 30 days = 30 × 3 = 90 units Remaining work = 150 – 90 = 60 units Work done by Rahul and Karan together = 60/(3+2) = 60/5 = 12 days
For α- amylase production the micro-organism required is
Element that act as an antioxidant and have synergistic effect with Vitamin E is
Which of the following microorganisms cannot tolerate oxygen?
In cucumber, chilling injury symptoms occur at:
In which of the following method, heating is due to electrical resistance of a food
Which of the following is the most fermentable sugar?
Iodized salt contains iodine in the form of:
Mold inhibitor used in bread is:
Which of the following fats increases heart disease risk?
Enzyme hydrolyzing bacterial cell wall is called