Start learning 50% faster. Sign in now
Total work = Number of days×1 day’s work (efficiency) Total work = LCM (5, 15) = 15 unit 1 day’s work of (A+B) = 15/5 = 3 unit 1 day’s work of A = 15/15 = 1 unit 1 day’s work of B = 3 - 1 = 2 unit Now, Time taken by B to completed the work = 15/2 = 7.5 days
1 mole of carbon atoms = ______ g of carbon atoms
A liquid rises in a capillary tube due to:
During electrolysis the reaction at anode is?
A body of mass 2 kg is moving in SHM with angular frequency 4 rad/s and amplitude 0.1 m. Max kinetic energy is:
What is the main cause of emphysema?
Which of the following hormones requires a cell surface receptor for its action?
Which part of the human brain controls voluntary actions?
If the phase difference between two points is 120° for a wave with velocity of 360 m/ and frequency 500 Hz, then path difference between the two points...
Consider the following statements
Statement I: Clay layers are poor aquifers.
Statement II: The inter-particle space of clay minerals is t...