Question
'Sumit' can complete (3/8) of a job in 24 days, where as
'Sumit' and 'Tarun' together can finish it in 16 days. Calculate the time 'Tarun' needs to complete 60% of the job alone.Solution
ATQ, Time taken by 'Sumit' to complete the whole job alone = 24×( 8/3) = 64 days Let the total amount of work = LCM of 64 and 16 = 64 units Efficiency of 'Sumit' =64/64 = 1 units per day Efficiency of (Sumit + Tarun) = 64/16 = 4 units per day Efficiency of 'Tarun' = 4 − 1 = 3 units per day Desired time = (0.60 × 64/3) = 12.8 days
Which of the following is/are true about blood pressure in the human body?
I. This pressure is much greater in arteries than in veins.
II....
Kindly Study the following questions carefully and choose the right answer.
Which of the following is/are true with respect to Amoeba?
I...
Which of the following represents the correct electronic configuration of nitrogen ?
The refractive index of water and turpentine oil are 1.33 and 1.47, respectively. A ray of light travels from
turpentine oil to water. The re...
Which of the following statements for the given chemical reaction is true?
Fe2O3Â + 2AlÂ
An electric dipole when held at 30 ֯ with respect to a uniform electric field of 103 N/c experience a torque of 12 × 10-26 Nm. C...
Which part of the brain is responsible for balance and coordination?
The base of an electric iron is brightly polished mainly -
The sky appears blue, because
In a nuclear reactor, one of the following is used as a fuel.