Question
'Sumit' can complete (3/8) of a job in 24 days, where as
'Sumit' and 'Tarun' together can finish it in 16 days. Calculate the time 'Tarun' needs to complete 60% of the job alone.Solution
ATQ, Time taken by 'Sumit' to complete the whole job alone = 24×( 8/3) = 64 days Let the total amount of work = LCM of 64 and 16 = 64 units Efficiency of 'Sumit' =64/64 = 1 units per day Efficiency of (Sumit + Tarun) = 64/16 = 4 units per day Efficiency of 'Tarun' = 4 − 1 = 3 units per day Desired time = (0.60 × 64/3) = 12.8 days
Boyle’s Law is applicable to gases under which conditions?
A closely wound solenoid 40 cm long has 5 layers of windings of 400 turns each. The diameter of the solenoid is 2 cm. If the current carried is 8.0 A, e...
For a projectile, maximum range is obtained when angle of projection is:
The intensity of any wave is proportional to which quantity?
Which phenomenon does a hologram use to create an image?
In Young’s double-slit experiment, if the distance between slits is increased, fringe width:
What is the work done when a force of 10 N moves an object by 5 m in the direction of the force?
A projectile is fired at an angle θ and reaches maximum height
H and range R. The angle between velocity and acceleration at the highest poin...
Which law explains why it is difficult to hammer a nail into a freely suspended wooden frame?
What is the speed of sound in air at room temperature (20°C)?