Question
A can finish a task by himself in 25 days, whereas B can
finish the same task by himself in 10 days. A begins the task but stops after 5 days, at which point B takes over and finishes the job. How many total days were required to complete the task?Solution
Let the total work = 50 units (L.C.M of 25 and 10) Efficiency of A = 50/25 = 2 units/day Efficiency of B = 50/10 = 5 units/day Amount of work done by A in 5 days = 2 × 5 = 10 units Remaining work = 50 – 10 = 40 units Time taken by B to complete the remaining work = 40/5 = 8 days Total number of days = 8 + 5 = 13 days
Aluminium Phosphide is used to control stored grain pest _____
‘Centering’. The first cut on a young tea plant is at which of the following:Â
Water is drawn upwards from the water table in a continuous network of pores. This upward movement of water occurs only in saturated soils is called
What is the major limitation of privatized extension services?
The land-related reform enacted to protect tenants from eviction and secure their right to cultivate the land is known as:
Triazines and triazinones inhibit ______
The critical limit for NO3-N (mg/litre) in drinking water (as per WHO standard is:
Khaira disease of rice can be controlled by spraying of ____________ .
Bengal famine in 1943 was caused due to which disease?
The scientific name of the Italian honey bee is