Question
A can complete a piece of work in 27 days. He worked for
21 days and then B finished the remaining work in 8 days. In how many days can A and B finish the work together?Solution
A can complete a piece of work in 27 days. A does the work in 27 days =1 A does the work in 1 day =1/27 A does the work in 21 days = (1/27) ×21=7/9 Remaining work =1-7/9 =2/9 Remaining work finished by B in 8 days =8×9/2=36days. A and B together finish the work – 27               36          108 4                 3 =108/4+3 =108/7  =15(3/7) days.
In a blockchain network, what are "nodes"?
What is the function of a router?
Which of the following components is used to amplify an analog signal?
How do you print the value of a variable ‘x’ in Python?
Which storage technology provides high-speed, non-volatile data storage but is volatile and temporary in nature?
In Go, what is the purpose of a goroutine?
Default value of boolean variable in an array
Which of the following is a characteristic of a public blockchain?
At which layer of the OSI model do hardware devices like switches primarily operate?
Which method is commonly used for error detection at the Data Link Layer?