Question
2 men and 3 boys can do a piece of work in 405 days
while 3 men and 2 boys can do the same work in 324 days. In how many days can 5 men and 5 boys do that work?Solution
According to the question, (2M+3B) x405 = (3M + 2B) ×324  810M+1215B=972M+648B 972M-810M=1215B-648B 162M = 567B M = 567B /162=7B / 2 Let 5 men and 2 boys complete the work in (x) days. (5M+5B) x = (3M + 2B) ×324 (5x7B/2+5B) x = (3x7B/2+2B) x324 (35B+10B) ×x/2=(25B×324)/2 (45B×x)/2 =25B×324)/2 X=(324×25B)/45B X=180days.
It is connected between a telephone line and computer is calledÂ
A__________ is an interactive computer application for organization, analysis and storage of data in tabular form.Â
________ is a software system allowing extensive cross-referencing between related sections of text and associated graphic material.
IM stands for:Â
______ is used at key checkpoints in the overall process to determine whether objectives are being met.
What is an applet?
Which of the following connects other computers through telephone lines?
There is ________ between the files if the same data is stored in different formats in two files or if data must be matched between files.
C, a programming language originally developed for developing
Formulas in Excel starts with