Question
P’s 5 days work is equal to Q’s 6 days work. If P
and Q together can complete the work in 25 days then how much time Q will take to complete 80% of the work?Solution
Ratio of efficiency of P and Q = 6:5 Let the efficiency of P and Q be 6x and 5x units per day respectively. Total work = 11x × 25 = 275x units Required time = (0.80 × 275x)/5x = 44 days
A frustum of a cone has a lower base radius of 5 cm, an upper base radius of 3 cm, and a height of 4 cm. What is the volume of the frustum?
Pawan and Bhanu started a business with their investments in the ratio 5:7. After 6 months, Raju joined the business with an inve...
A bag contains red, blue, and green balls in the ratio of 2:4:5. If two balls are randomly selected from the bag, the probability that both are blue is ...
If z=2+3i, then arg(z)=θ lies in which quadrant?
From a point located x meters away from the base of a tree, the angle of elevation to the top of the tree is 60 ∘ . If the tree is 54 mete...
What is the value of 8 √ 4 × 16 √ 4?Â
The conjugate of z = 2 − 5i is:
The bar graph given below shows the number of JK Tyres manufactured by a Showroom on five different days. Read the graph carefully and answer the questi...
The value of tan 225° is same as the value of:
In a triangle ABC, the sides are AB = 15 cm, BC = 20 cm, and AC = 25 cm. Find the area of the triangle using Heron’s formula.