Question
Aβ and βBβ together can complete a work in 10 days
while βAβ takes 18 days to complete the same work alone. If βCβ is 25% more efficient than βBβ, then find the time taken by βCβ alone to complete the whole work.Solution
Let the total work = 90 units Efficiency of (A + B) = 90/10 = 9 units/day Efficiency of βAβ = 90/18 = 5 unit/day Therefore, efficiency of βBβ = 9 β 5 = 4 units/day Efficiency of βCβ = 1.25 Γ 4 = 5 units/day Required time taken = 90/5 = 18 days
The Pointing vector of electromagnetic waves has the same dimensions as that of:
A train runs along an unbanked circular track of radius of 10 m at speed of 36 km/h. The mass of the train is 16 kg.
What is the an...
A potentiometer is an accurate and versatile device to make electrical measurements of E.M.F. because the method involves:
An ant can see objects all around it due to the presence of which type of eyes?
When a liquid is heated in a container, which of the following processes primarily causes the heat transfer within the liquid?Β Β
The apparent weight of a person in a lift moving downward with uniform acceleration is:Β
Which of the following correctly ranks molecular speeds at a fixed temperature?
Two blocks of masses 2 kg and 4 kg are connected by a light spring (k = 300 N/m) and placed on a smooth horizontal surface. The spring is compressed by ...
A string of length L is fixed at both ends. It supports a standing wave with 3 antinodes. If the speed of the wave on the string is v, what is the freq...
Two long parallel wires 2 cm apart carry 5 A and 3 A currents in the same direction. What is the force per unit length on one wire?