180 unit of work can be completed by P alone in 30 days.
P started working alone and joined by Q after 18 days such that they completed the remaining work in 6 days. Find the number of days taken by Q to complete the whole work alone.Solution
Let the efficiency of Q = x units/day Efficiency of P = (180/30) = 6 units/day According to question: 6 × 18 + (6 + x) × 6 = 180 Or, 108 + 36 + 6x = 180 Or, 6x = 180 – 144 Or, 6x = 36 Or, x = 6 Number of days taken by Q to complete the work alone = (180/6) = 30 days
What type of radiation is produced by a hot object emitting energy? Â
A plane mirror is placed on a wall. A man walks directly toward the mirror at 2 m/s. The speed at which his image approaches him is:
If a force of 20 N is applied to push a 4 kg object, what is the acceleration produced? Â
What does 'IC' stand for in electronics?
Which of the following is a reason for excessive current in electrical circuits?
I. Direct touching of wires
II. Connection of many d...
Which of the following is the SI unit of electric charge?
Why does a lemon appear larger when viewed from the side of a glass of water?
If a body of mass 5 kg is raised to 10 meters height, find its potential energy. (g = 9.8 m/s²) Â
Planck’s constant has dimensions equivalent to which of the following?
Which quantity has the same dimensional formula as impulse?