A and B can do job in 8 days. B and C can do same job in
12 days. A, B and C together can do same job in 6 days. In how many days A and C together can complete the job?Solution
Total work = Number of days × 1 day’s work (efficiency) Total work = LCM (8, 12, 6) = 24 unit 1 day’s work of (A+B) = 24/8 = 3 unit 1 day’s work of (B + C) = 24/12 = 2 unit 1 day’s work of (A + B + C) = 24/6 = 4 unit Now, 1 day’s work of A = 4 – 2 = 2 1 day’s work of C = 4 – 3 = 1 1 day’s work of A and C = 2 + 1 = 3 A and C together can complete the job in = 24/3 = 8 days
What is the thermal efficiency for diesel engine?
Karnal bunt of wheat is caused by
____ is the only design in which principle of local control is not used.
Water movement in a saturated soil is governed by
The primary function of waxing fruits after harvest is to:
Proteins that serve as ion channels are always ______ membrane proteins.
Liquid nitrogen: Used to store seeds at -196°C, which stops metabolic deterioration and protects the seeds from contamination.
The ability of a microorganism to cause disease is called........................?
For Which medicinal condition is white brinjal particularly recommended for in traditional practices?
Regeneration of whole plant from callus and suspension cultures in the nutrient medium isÂ