Question
P’s 3 days work is equal to Q’s 5 days work. If P
and Q together can complete the work in 30 days then how much time Q will take to complete 75% of the work?Solution
Ratio of efficiency of P and Q = 5:3 Let the efficiency of P and Q be 5x and 3x units per day respectively. Total work = 8x × 30 = 240x units Required time = (0.75 × 240x)/3x = 60 days
Various IPC mechanisms are:
...Basic syntax to create a bar-chart in R is
In which case higher bandwidth can be achieved
Which type of power plant generates electricity by converting the kinetic energy of wind into mechanical energy?
What will be the output of the following code snippet?
int num = 10;
int *ptr = #
printf("%d", *ptr);
What is the term for the minimum voltage required to turn on a transistor?
What is the SI unit of electric potential difference?
Identify the highest normal form for the given set of dependencies on relation R
R(ABCDE)= {AB → C, C → D, D → E, E → A,D → B}
A 240V, 10A electric heater is used. Calculate the power consumed by the heater.
In UML diagram of a class