Question
Who among the following lives two floors above the
floor on which A lives in the same flat? Answer the questions based on the information given below. Eleven persons K, A, B, C, D, E, F, G, H, I and J live in four storey building having four floors such that lowermost floor is numbered as 1 and floor immediately above the lowermost floor is numbered as 2 and so on. Each floor has 3 flats numbered as 1, 2 and 3 from west to east such that flat – 1 is in west of flat – 2 and flat – 2 is in west of flat – 3. One of the flats on a floor is vacant. The dimensions of each of the flats are same. Note: If there is one/two floor(s) between two flats then they may or may not have the same flat number of different floors. J lives in an even numbered flat on floor number 2. A and B live on same floor. A lives in an even numbered flat on lowermost floor. F and K live on same floor. All the flats on the floor on which E lives are occupied. H lives to the west of F. A lives on the floor on which two other persons live. There is one floor between F and E. D’s flat is immediately above B’s flat and the numbers of their flats is same. F lives immediately below the vacant flat and the flat number of vacant flat and F is same. C lives somewhere above I in same flat number, but not on flat 3.K lives in flat – 1.Solution
A lives in an even numbered flat on lowermost floor i.e. A lives on floor ground floor in flat 2. J lives in an even numbered flat on floor number 2. A and B live on same floor. D lives immediately above Name the numbers of their flats is same. So, Now, B either lives immediate west or east of A which means D either lives in flat 3 or flat 1. So, we have two possibilities. Case I: When B and D live on flat – 3: C lives somewhere above I in same flat number, but not on flat 3. Now, we cannot fix C and I in same flat number in case II, so, case II is invalid. The final arrangement is as follows:
28 men can complete a work in 20 days. 40 women can complete the same work in 28 days. 20 men and 12 women started working and after 16 days, 20 more wo...
- Arun and Varun take up an assignment together. Arun finishes 3 units per day, while Varun can complete the entire assignment in 12 days. The total work amo...
40 men are engaged to dig a 4 km long drainage channel. After working 12 days, only 1/2 of the work is done. Then 8 more men are employed. Find the numb...
A can finish a work in 18 days and B can finish it in 24 days. They work together for 6 days, then A leaves. In how many more days will B finish the re...
A does 1/2 work and B does 3/4 work in the same time. Difference between number of days taken by A and B to work alone to complete the work individually...
Rahul alone can do 60% of the same piece of work in (z-4) days. Queen and Rahul together can do 75% of the same piece of work in (0.5z+4) days. Pankaj a...
A group of 21 boys, each working 6 hours a day, complete a school project in 15 days. How many days will it take for 18 boys, wor...
P, Q, R and S can do a piece of work in 20 days. If P and Q together can do it in 50 days, and R alone in 60 days, then in how many days can S alone do it?
Efficiency of A, and B are in the ratio of 2 : 3. If both can do a work together in 60 days. Find out how much days A will take to complete the work alone?
Arun and Bala, alone can complete a work in 20 days and 30 days, respectively. They started the work together and left after 8 days such that the remai...