Question
If 12 persons working 12 hours a day dig 12 meters of a
tunnel in 12 days how many men are required to dig additional 4 meter of the tunnel (of the same dimension) given that they work 4 hours a day for 4 day?Solution
ATQ, we can say that Given: 12 persons working 12 hours a day dig 12 meters of a tunnel in 12 day Let the number of men required be x (12 × 12 × 12)/12 = (x × 4 × 4)/4  x = 36 ∴ Number of men required be 36
Which one of the following vitamins is synthesized in our own skin?
A fish is at a depth d below the surface of a water tank. A cat observes the fish from air. Due to refraction at water-air interface, the apparent depth...
Speed of sound in air is unaffected by change in :
What is the unit of electric current?
The force required to maintain an object at a constant velocity is
Which of the following are environment-friendly practices ?
Which part of the body is affected by tuberculosis (TB)?
What is the chemical formula of common salt?
Which of the following is NOT a method to improve crop yields in India?