Question
If 12 persons working 12 hours a day dig 12 meters of a
tunnel in 12 days how many men are required to dig additional 4 meter of the tunnel (of the same dimension) given that they work 4 hours a day for 4 day?Solution
ATQ, we can say that Given: 12 persons working 12 hours a day dig 12 meters of a tunnel in 12 day Let the number of men required be x (12 × 12 × 12)/12 = (x × 4 × 4)/4 x = 36 ∴ Number of men required be 36
Which of the following is not a financial asset in accordance with IND AS 109?
Bank credit to NBFCs (including HFCs) for on-lending will be allowed up to what limit of an individual bank’s total priority sector lending in case of...
Which of the following correctly defines Yield to maturity (YTM)?
Which of the following is a long-term cooperative credit institution?
What is the typical settlement method for futures contracts?
What is meant by a “zero-sum game” in the context of forward contracts?
Sh Ajay Kumar Chaudhary who is appointed as a new Executive Director of RBI, was earlier designated as:
Lead Bank Scheme was introduced in:
Regional Rural Banks (RRBs) were established in which year?
Which of the following is a window for the banks to borrow from RBI in an emergency when inter-bank liquidity dries up completely.