Question
Three workers A, B and C can complete a job in 12, 15
and 20 days respectively, working alone. All three start working together. After some time, C leaves, and A and B complete the remaining work in 2 more days. If the total time taken to finish the work is 5.5 days, for how many days did C work?Solution
ATQ, Let total work = LCM(12,15,20) = 60 units. Rates: A = 60/12 = 5 units/day B = 60/15 = 4 units/day C = 60/20 = 3 units/day Total time = 5.5 days. A and B work the whole time; C works for t days. After C leaves, A and B take 2 more days β C worked for t = 5.5 β 2 = 3.5 days. Work done in first 3.5 days by A + B + C = (5 + 4 + 3) Γ 3.5 = 12 Γ 3.5 = 42 units. Remaining work = 60 β 42 = 18 units, done by A + B in 2 days: (5 + 4) Γ 2 = 9 Γ 2 = 18 units (consistent). So C worked for 3.5 days.
Fertilizer which is present in granulated form and not in vapor form.
FRI ( forest research institute ) was established is located at
The movement and filtration of water through soils and permeable rock is termed as
What is the premium rate for rabi crops under PMFBY
Which of the following is correct in case of seedlings?
Which of the following is used as a purgative in animals?
Which of the following is an Open Sourced Software?
The optimum age of seedling for transplanting long duration rice varieties is
Under the given options, which of the following is the provision under NFSA 2013?Β
Agro-climatic zones in India are formed during