Question
Three workers A, B and C can complete a job in 12, 15
and 20 days respectively, working alone. All three start working together. After some time, C leaves, and A and B complete the remaining work in 2 more days. If the total time taken to finish the work is 5.5 days, for how many days did C work?Solution
ATQ, Let total work = LCM(12,15,20) = 60 units. Rates: A = 60/12 = 5 units/day B = 60/15 = 4 units/day C = 60/20 = 3 units/day Total time = 5.5 days. A and B work the whole time; C works for t days. After C leaves, A and B take 2 more days ⇒ C worked for t = 5.5 − 2 = 3.5 days. Work done in first 3.5 days by A + B + C = (5 + 4 + 3) × 3.5 = 12 × 3.5 = 42 units. Remaining work = 60 − 42 = 18 units, done by A + B in 2 days: (5 + 4) × 2 = 9 × 2 = 18 units (consistent). So C worked for 3.5 days.
Why do brads not have respiratory trouble at the time of flying at high all?
Which among the following is not a characteristic of transition metals?
A metallic conductor of circular cross-section has radius R. If current density varies as J = Jₒ(1−r/R), the total current through the conductor is:...
If the distance between two consecutive crests is L, then the wavelength is given by______.
What is the weight of a 10 kg object on Earth? (Take g = 9.8 m/s²) Â
A wire is stretched by a force such that it experiences a strain of 2 x 10-3. If Young’s modulus of the material is 2 x 1011 Pa,...
Gamma rays have greatest similarity with –
Which of the following is NOT a vector quantity? Â
If the specific heat at constant pressure Cₚ is greater than Cᵥ , the difference Cₚ -Cᵥ is equal to:
A liquid is kept in a regular cylindrical vessel up to a certain height. If this vessel is replaced by another cylindrical vessel having half the area o...