Question
‘A’ can complete a job in 36 days. ‘B’ takes 3
times as long as ‘A’ to finish the same job. If both work together, how much of the work will they finish in 18 days?Solution
ATQ,
Time taken by ‘B’ to complete the total work = 36 × 3 = 108 days
Let total work be 108 units (LCM of 36 and 108)
Efficiency of ‘A’ = 108 / 36 = 3 units/day
Efficiency of ‘B’ = 108 / 108 = 1 unit/day
Work done in 18 days = (3 + 1) × 18 = 72 units
So, together they complete = 72 / 108 = 2/3 of the total work
The absolute density of soil is also referred to as ……………….which is generally 2.60-2.75 gm/cm3
Flooding is the method used for the reclamation practice in which of the problematic soil?
Rock Phosphate is applied in which type of soil?
The soil amendment used for the reclamation of Sodic soil is
In which soil order is cryopedoturbation, a frost churning process resulting from the freezing and thawing of soil material, predominantly observed?
Heaviness and lightness of soil refers to
Under Soil Health Card Scheme, what is the cycle of testing of soil for irrigated area and area from which single sample is to be drawn?
What is soil sickness?
The soils of grassland ecosystems, characterized by a thick, dark surface horizon comes under which soil order?
According to USDA classification of salt affected soils; a soil having EC >4 mmho/cm; ESP >15; pH