A and B together can complete a task in 12 days, while A
alone can complete the same task in 20 days. If A and B start the work together, but B leaves after 8 days, in how many more days will A complete the remaining work?Solution
Work done by A and B in 1 day = 1/12 Work done by A alone in 1 day = 1/20 Work done by B in 1 day = 1/12 - 1/20 = 1/30 Work completed in 8 days by A and B = 8 × 1/12 = 2/3 Remaining work = 1 - 2/3 = 1/3 Time taken by A to complete remaining work = (1/3) ÷ (1/20) = 20/3 = 6.67 days. Correct answer: a) 6.67 days
Find the circumference and area of a circle of radius 7 cm. Take π = 22/7.
The base of the triangular area is two times its height. If the cost of farming area is Rs. 2000 and Rs. 80 per hectare. Find its base (1 hectare = ...
The breadth of a rectangle is increased by 9 cm, it will become twice the length of the rectangle. If the new perimeter is 294 cm, then find the origina...
Two wires A and B are made of the same material and have the same length but different cross-sectional areas. If the resistance of wire A is 9 times the...
The cost of fencing a rectangular field at the rate of Rs. 5/metre is Rs. 350. If the length of the field is 11 metres more than its breadth, then find ...
In a rectangular floor of length and breadth of 19 metres and 6 metres, respectively, square tiles each of 2 metre edge length are to be laid. If the co...
The perimeter of an equilateral triangle is 36√3 cm. Find its height.
The volume of a cuboid is 480 cubic cm. If its length is 10 cm and breadth is 8 cm, find its height.
Find the length of a wire radius 0.40 cm which can completely cover the surface of a cylinder whose height is 1.6m and base radius 21 cm?
A wire, when bent in the form of a square encloses an area of 121 sq. cm. If the same wire is bent in the form of a circle, what is the area enclosed by...