Question
A and B together can complete a task in 12 days, while A
alone can complete the same task in 20 days. If A and B start the work together, but B leaves after 8 days, in how many more days will A complete the remaining work?Solution
Work done by A and B in 1 day = 1/12 Work done by A alone in 1 day = 1/20 Work done by B in 1 day = 1/12 - 1/20 = 1/30 Work completed in 8 days by A and B = 8 Γ 1/12 = 2/3 Remaining work = 1 - 2/3 = 1/3 Time taken by A to complete remaining work = (1/3) Γ· (1/20) = 20/3 = 6.67 days. Correct answer: a) 6.67 days
In 2018, the income-to-expenditure ratio of Vishal was 5:3. The following year, his income increased by 10% while his expenditure rose by 15%. Determine...
What is the value of β25% =?
Raj saves Rs. 7500 more if he spends 60% of his income instead of 90%. Find the savings of Sanjay whose income is 30% more than that of Raj, and spends ...
- In a local election between two candidates, the winning candidate secured 72% of the total valid votes and won the election by a margin of 1800 votes. Find...
The sum of the monthly incomes of βAβ, βBβ and βCβ is Rs. 40000 which is 4 times the monthly income of βCβ. If βAβ spends 30% of his...
In a given years, A sold 1600 caps while B sold 30% more number of caps than A and C sold 20% less number of caps than B. Find the ratio between the num...
In a school election for the position of president, two students were competing. Among the eligible voters, 80% participated by c...
The marks scored by a boy in three subjects are in the ratio 4 : 3 : 2. Boy scored an overall aggregate of 60% in the exam. If the maximum marks in each...
- A number is first increased by 18% and then decreased by 18%. The overall change in number is:
In an election contested between two candidates, 75% of the total voters in the city participated in voting, out of which 20% of ...