Question
A, B, and C can finish a work in 12, 15, and 20 days,
respectively. They all start working together, but A leaves after 4 days, and B leaves after 1 more days. How much longer will C take to finish the remaining work?Solution
Work done by A in 4 days = 4 / 12 = 1/3. Work done by B in 5 days = 5 / 15 = 1/3. Total work done by A and B = 1/3 + 1/3 = 2/3. Remaining work = 1 - 2/3 = 1/3. Work done by C per day = 1/20. Time taken by C to finish 1/3 work = (1/3) / (1/20) = 20 / 3 = 6.67 days But since 5 days he was working with them, which means he will take extra = 6.67 – 5 = 1.67 days Correct answer: a) 1.67 days.
In a certain coded language PURPLE is coded as TXRGOR, then how is POLITY coded in that coded language?
According to the given code, find the code word of ‘experience similar soldier definition’?
In a certain code, 'MANGO' is coded as ‘250’. Then how will ' ORANGE ' be written in that code?
Unscramble the following letters to frame a meaningful word, then find out the correct numerical position of the letters:
In a certain language,
'pl zs ls' means 'conspiracy was hatched',
'uq al bg' means 'would replace him'
'bg kr ls' means ‘him as h...
In a certain code language, ‘GEAR’ is written as ‘62’ and ‘RAIN’ is written as ‘84’. How will ‘SHOT’ be written in that code langua...
What is the code for the word ‘silence situation’?
If in a certain coding language, ‘PERFORMANCE’ is written as ‘81’, how will ‘PLATFORM’ be written using the same code?
In a certain code language, ‘BUTTER’ is coded as ‘CWWSCO’ and ‘THEORY’ is coded as ‘UJHNPV’. How will ‘LATENT’ be coded in that lang...
If ‘ANKLET’ is coded as ‘EJGHIP’ and ‘APPLY’ is coded as ‘ELLHU’, then ‘DRIVER’ will be coded as ____ in the same code language.
...