Question
A, B, and C can finish a work in 12, 15, and 20 days,
respectively. They all start working together, but A leaves after 4 days, and B leaves after 1 more days. How much longer will C take to finish the remaining work?Solution
Work done by A in 4 days = 4 / 12 = 1/3. Work done by B in 5 days = 5 / 15 = 1/3. Total work done by A and B = 1/3 + 1/3 = 2/3. Remaining work = 1 - 2/3 = 1/3. Work done by C per day = 1/20. Time taken by C to finish 1/3 work = (1/3) / (1/20) = 20 / 3 = 6.67 days But since 5 days he was working with them, which means he will take extra = 6.67 – 5 = 1.67 days Correct answer: a) 1.67 days.
In 2018, the income-to-expenditure ratio of Vishal was 5:3. The following year, his income increased by 10% while his expenditure rose by 15%. Determine...
What is the value of √25% =?
Raj saves Rs. 7500 more if he spends 60% of his income instead of 90%. Find the savings of Sanjay whose income is 30% more than that of Raj, and spends ...
- In a local election between two candidates, the winning candidate secured 72% of the total valid votes and won the election by a margin of 1800 votes. Find...
The sum of the monthly incomes of ‘A’, ‘B’ and ‘C’ is Rs. 40000 which is 4 times the monthly income of ‘C’. If ‘A’ spends 30% of his...
In a given years, A sold 1600 caps while B sold 30% more number of caps than A and C sold 20% less number of caps than B. Find the ratio between the num...
In a school election for the position of president, two students were competing. Among the eligible voters, 80% participated by c...
The marks scored by a boy in three subjects are in the ratio 4 : 3 : 2. Boy scored an overall aggregate of 60% in the exam. If the maximum marks in each...
- A number is first increased by 18% and then decreased by 18%. The overall change in number is:
In an election contested between two candidates, 75% of the total voters in the city participated in voting, out of which 20% of ...