Question
A, B, and C can finish a work in 12, 15, and 20 days,
respectively. They all start working together, but A leaves after 4 days, and B leaves after 1 more days. How much longer will C take to finish the remaining work?Solution
Work done by A in 4 days = 4 / 12 = 1/3. Work done by B in 5 days = 5 / 15 = 1/3. Total work done by A and B = 1/3 + 1/3 = 2/3. Remaining work = 1 - 2/3 = 1/3. Work done by C per day = 1/20. Time taken by C to finish 1/3 work = (1/3) / (1/20) = 20 / 3 = 6.67 days But since 5 days he was working with them, which means he will take extra = 6.67 â 5 = 1.67 days Correct answer: a) 1.67 days.
A series is given with one term missing. Choose the correct alternatives from the given ones that will complete the series.
44, 48, 73, 79, 128, ___
The code for âlife while goingâ is
Select the pair in which the numbers are related to each other in the same way as are the numbers in the given pairs. (NOTE: Operations should be perfor...
Three of the following number-pairs are alike in some manner and hence form a group. Which number-pair does not belong to that group? (NOTE: Operations ...
Statement:
Some Boat are Stream
Few Stream are Captain
Only a few Captain are Boat
Conclusion:
I. Some Boat are...
In a certain code language, âOBLIGATEâ is coded as âQNAKICVGâ. What is the code for âDOCUMENTâ in the same code language?
...Select the correct option that indicates the arrangement of the following words in a logical and meaningful order.
1. Word
2. Paragraph
There are five girls-A,B,C,D and  E sitting in a row facing North. E is sitting exactly in middle of the row, B  is sitting to the immediate right a...
In a certain code RUMOUR is written as 49×794 and GRAM is written as #4@×. How will you write MARGO in that code?
Which of the following letter-clusters should replace # and % so that the pattern and relationship followed between the letter-cluster pair on the left...