Start learning 50% faster. Sign in now
Work done by A in 4 days = 4 / 12 = 1/3. Work done by B in 5 days = 5 / 15 = 1/3. Total work done by A and B = 1/3 + 1/3 = 2/3. Remaining work = 1 - 2/3 = 1/3. Work done by C per day = 1/20. Time taken by C to finish 1/3 work = (1/3) / (1/20) = 20 / 3 = 6.67 days But since 5 days he was working with them, which means he will take extra = 6.67 – 5 = 1.67 days Correct answer: a) 1.67 days.
What is a key factor that influences the rate of moisture loss from the soil through the process of evaporation?
Glycolysis takes place in
What is the type of farming done along the contour of sloping land to avoid soil erosion with slope less than 33%?
Aflatoxin is an example of
Which of the following is a specific mutagen commonly used in plant breeding to induce genetic mutations?
Windbreaks are planted in which direction?
Which method involves the fusion of two naked gametes, one of which must be motile, and is common in aquatic fungi?
Deforestation is
Choose the correct one
The four principles of organic farming do not include