Question
Ten men begin to do work. But after some days, four of
them left the job. As a result, the job that could have been completed in 40 days is completed in 50 days. How many days after the commencement of the work did the four men leave?Solution
Let 4 men leave after x days. Β A.T.Q. - 10x + 6(50 β x) = 40 Γ 10 Β 10x + 300 β 6x = 400 4x=100 Β x = 25 days
From the top of an upright pole 30β3 feet high, the angle of elevation to the top of an upright tower was 60Β°. If the foot of the pole was 55 feet aw...
A tree breaks due to a storm and the top touches the ground 30 meters away from its base, making a 30-degree angle with the ground. What was the height ...
A pole 21 m high casts a shadow 7β3 m long on the ground. Find the angle of elevation
From a point on level ground, the angle of elevation of the top of a vertical tower is 30Β°. On moving 30 m closer to the tower, the angle of elevation ...
A boat is being rowed away from a cliff 183 m high. From the top of the cliff, the angle of depression of the boat changes from 60Β° to 45Β° in 3 minute...
From a point on the ground, the angle of elevation of the top of a tower is 30 degrees. After moving 20 m towards the tower, the angle becomes 60 degree...
There is a fire in the building. A man on the top of the building see a Fire brigade van coming towards it. If it takes 8 minutes for the angle of depre...
The distance between two parallel poles is 65√3 m. The angle of depression of the top of the second pole when seen from the top of first pole is 3...
- From a point 'P' on level ground, the angle of elevation to the top of a tower 60 metres tall is 45β°. Calculate the shortest distance from point 'P' to t...
If distance between two pillars of length 9 & 4 cm is x cm. If two angle of elevation of their respective top from a point on ground of other are comple...