Question
An elephant can do a work as fast as two horses βAβ
and βBβ can do it by working together. If horse βAβ alone can complete the work in 18 hours and horse βBβ in 36 hours, then find the time taken by elephant to complete the work.Solution
Let the total work = 36 units Efficiency of horse who can complete the work in 18 hours = 36/18 = 2 units/hour Efficiency of horse who can complete the work in 36 hours = 36/36 = 1 units/hour Therefore, time taken by both horses to complete the work together = 36/(2 + 1) = 12 hours Therefore, time taken by the elephant to complete the work = 12 hours
The volume and height of a cylinder are 4224 cm3 and 21 cm. Find the radius of the cylinder.
On a circular racetrack that measures 4,000 meters in circumference, Kia and Sia begin a race at the same point and at the same time, traveling at speed...
A solid rectangular parallelepiped (cuboid) has dimensions 10 cm Γ 8 cm Γ 6 cm. It is melted and cast into small cubes each of side 2 cm. How many suc...
The length and breadth of a rectangular field are 45 m and 28 m respectively. What is its area?
Perimeter of a square field is 120 meters and the area of a rectangular field is 65% more than that of the square field. Find the area (in m2...
A rectangular park is 50 m long and 40 m wide. A path of uniform width is built inside the park along the boundary. The area of the path is 344 mΒ². Fin...
The distance of the School and house of Suresh is 80 km. One day he was late by 1 hour than the normal time to leave for the college, so he increased hi...
The perimeter of a floor a room is 36m. What is the area of four walls of the room, if its height is 6m?
If a triangle with base 7 cm has the same area as a circle with radius 7 cm, then the corresponding altitude (in cm) of the triangle is:Β
If β ABC~β FDE such that AB = 9 cm, AC = 11 cm, DF = 16 cm and DE = 12 cm, then the length of BC is: