P and Q individually can complete the work in 18 days
and 27 days respectively. If the time taken by R alone to complete the work is 1.25 times the time taken by P and Q together to complete the work, find the time taken by R to complete the work while working alone. MTSolution
Time taken by P and Q together to complete the work = (18 × 27)/ (18 + 27) = 10.8 days Time taken by R alone to complete the work = 1.25 × 10.8 = 13.5 days
In each of the following questions four words have been highlighted, which may or may not be in their correct position. You are required to interchange ...
Two sentences are given below, with three words emboldened in each of them. Interchange the words between two sentences to form a grammatically and con...
A sentence is given with five words highlighted in bold and marked as (A), (B), (C), (D) and (E). Choose the option with the pair(s) of words that need ...
The U.S. and the U.K. have often themselves (A) their fingers at developing countries (B) on human rights violations (C) and now find wagged (D) in the ...
In each of the questions given below, four words are given in bold. These four words may or may not be in their correct position. The sentence is then ...
Direction: In each of the questions given below, four words are given in bold. These four words may or may not be in their correct position. The sentenc...
- In the question given below, four words are given in bold. These four words may or may not be in their correct position. The sentence is then followed by o...
Directions: In each of the following questions a sentence is given with four words given in bold. Which of the following words should replace each othe...
In each of the questions given below, four words are given in bold. These four words may or may not be in their correct position. The sentence is then ...
Direction : In each of the following questions a grammatically correct and meaningful sentence is given with four words given in bold in each. Which of...