Start learning 50% faster. Sign in now
Speed of the train = 117 × (5/18) = 32.5 m/sec Length of the train = 32.5 × 19 = 617.5 metres Let the length of the platform be ‘x’ metres Therefore, 617.5 + x = 32.5 × 23 Or, x = 747.5 – 617.5 = 130 metres
The limitation period of prosecutions under section 27 of the Contract Labour (Regulation and Abolition) Act, 1970 is —
Under the Companies Act, what change was made regarding the common seal of a company after the Companies (Amendment) Act, 2015?
The Board shall, ________ of the receipt of a reference from the Adjudicating Authority for the recommendation of an insolvency professional who may...
‘A’ without any excuse fires a loaded gun into crowd of persons and kills one of them."
As per the Indian Penal Code, 1860, ‘A’ is gui...
If a company which is formed with unlimited liability wants to convert to limited liability then it should pass________________
Twelfth Schedule of the Constitution of India deals with_______.
In accordance with the wage periods for fixing the minimum rate of wages on a time work basis, which of the following periods may be used as per the Cod...
Which kind of hurt is not a grievous hurt?
Among the following which section deals with the admissibility of Evidence shall be decided by the Judge_____
Contingent agreements to do or not to do anything, if an impossible event happens, are void________.