Question
20 workers are employed to complete a work in 40 days.
But some workers leave the job after 16 days of work. The remaining workers complete the work in 46 days from its beginning. How many workers left the job after 16 days? type-sscSolution
D₁ = (40-16) = 24 D2=(46-40) =6 Let the M1=x and M2=x-4 M₁D₁ = M2 D2 X × 24 = (20-x) ×6 4x=20-x 5x=20 x=4 Hence, after 16 days 4 workers left work.
The income of a person is Rs.15000 and his expenditure is Rs.11000. In the next year his income and expenditure are increased by 8% and 16% respectively...
If the 4-digit number x67y is exactly divisible by 9, then the least value of (x + y) is _____.
Radius of a cylindrical vessel is 3cm less than breadth of rectangle, while height of cylindrical vessel is equal to length of rectangle, whose area is...
The volume and height of a cylinder are 2662 cm3 and 7 cm. Find the radius of the cylinder.
If the volume of a cuboidal tank is 3840 m3 and the ratio of the length, width and height of tank is 5:4:3 respectively then find the height ...
- The curved surface area of a cone is 2013.6 cm² and its radius is 12 cm. Determine the height.
Each side of square ‘A’ is 5 cm less than that of square ‘B’. The perimeter of a rectangle is 2 times the difference of the perimeters of the tw...
The volume of a hemisphere is 2425 (1/ 2) cm3. Find its diameter (Take p = 22/7)
In an equilateral triangle ABC, D is the midpoint of side BC. If the length of BC is 8 cm, then the height of the triangle is:
- The length of the shortest median of a right-angled triangle is 7 cm. What is the length of its hypotenuse?