Anita is 1100% more efficient than Veena. If Veena can do (1/24)th part of work in six days, then Anita alone can complete the work in_______days. If Anita works at 120% of his original efficiency and Veena works at 360% of his efficiency then they together will take______ days to complete the work.The following options is possible for the two blanks in the same order?
ATQ, Let us assume that Veena takes 'v' days to complete the work. One days work of Anita will be = ((100 + 1100)/100) × (1/v) = (12/v) Anita takes (v/12) days to complete the work. [1/(24 × 6)] = (1/v) v = 144 days Anita takes 12 days and veena takes 144 days to complete the work. [(120/100) × (1/12)] + [(360/100) × (1/144)] = (1/8) = Anita with 120% of her efficiency and veena with 360% of his efficiency they together can complete the work in 8 days. Hence the two blanks are 12, 8
Which one the following crop is called biological plough of soil?
In duopsony market there will be
Premature leaf fall of apple is caused by
How much of rainfall quantities is required in a day of 24 hours to call it a rainy day?
The nutrient removed in maximum quantity by paddy crop is:
What is the name of the improved variety of the national flower Lotus with 108 petals, launched by CSIR-National Botanical Research Institute?
What is the function of the crop in the foregut of insects?
Which of the following fertiliser is both in ammonium and nitrate form?
First interspecific cross was made by which of the following Scientist?
Plant’s ability to chemically inhibit the growth of other plants is called