[16 × 15 + 224 × 5] ÷ 5 = ? × 4
ATQ, [16 × 15 + 224 × 5] ÷ 5 = ? × 4 ? × 4 = 16 × 3 + 224 ? = (224 + 48)/4 = 68
A, B, and C together can do a work alone in 18 days, 32 days, and 60 days respectively. A alone starts the work and work for 3 days and leaves the work,...
A contractor undertook to do a work in 60 days and employed 30 men to do it. After 45 days he found that only `3/5` th of the work was done. How many mo...
50 men can complete a piece of work in 15 days. 10 men started the same work and worked for 10 days, and then joined by ‘x’ more men such that the r...
P’s 5 days work is equal to Q’s 6 days work. If P and Q together can complete the work in 25 days then how much time Q will take to complete 60% of ...
A tank is filled by three pipes with uniform flow. The first two pipes operating simultaneously fill the tank in the same time during which the tank is ...
Rohan can do a piece of work in 30 days. Rohan with the help of Karan does the same piece of work in 20 days. If they are paid Rs 3696 for the work, the...
Chacha and Bhatija can complete a work in 48 days. In how many days Chacha alone does the 2/3rd of the total work if they start working toget...
‘M’ is 60% more efficient than ‘N’. ‘N’ started the work alone and worked for 20 days and after that ‘N’ is replaced by ‘M’. If the ...
A group of workers was put on a job. From the second day onwards, 1 worker left work everyday. If no worker was left when 52% of the work gets complete...
Akhil and Nikhil together can complete a work in 12 days while Nikhil alone takes 18 days to complete 30% of the work. If the efficiency of Sachin is 25...