Question
Rs. 2016 was wrongly divided between βPβ, βQβ,
and βRβ in the ratio of 6:7:9, respectively, instead of (1/6):(1/7):(1/9). Amount received by βQβ was how much more/less than the original amount that he should receive.Solution
ATQ Ratio of amount received by βPβ, βQβ, and βRβ respectively, originally = (1/6):(1/7):(1/9)Γ 126 = 21:18:14 So, the amount that should be received by βQβ originally = (18/53)Γ2016=Rs.684 Amount received by βQβ actually = (7/22)Γ2016=Rs.644 Desired difference = 684 β 644 = Rs. 40
βAβ alone can do some work in 10 days. βBβ and βCβ together can do the same work in 4 days. If βBβ is half as efficient as βAβ, then...
A 480-liter blend contains soap and water in a 5:3 ratio. Adding 60 liters of soap and (6u + 30) liters of water changes the ratio to 6:5. Find the rati...
5 girls can do a piece of work in 9 days, 4 boys can do the same piece of work in 8 days, 6 men do the same piece of work in 2 days and 4 women can do t...
A can complete a work in 15 days. B takes 6 days less than A to complete the same work. In how many days can both of them together complete 80% of the w...
If Pawan can do a piece of work in 6 days and Mantu can complete the same work in 2 days, then in how many days will both of them together complete the ...
55 men can complete a piece of work in 12 days. 15 men started the same work and worked for 10 days, and then joined by βxβ more men such that the r...
Pβs 4 days work is equal to Qβs 5 days work. If P and Q together can complete the work in 20 days then how much time Q will take to complete 40% of ...
It is given that 40% of the work completed by Lokesh is equal to 30% of the work completed by Meena. If Lokesh alone can complete the entire work in 28 ...
Karan, Arjun and Krunal alone can complete a work in 30, 45 and 36 days respectively. All of them started working together but after 3 days from start K...
A and B together can do a work in 5 days. If A can alone do the same work in 15 days, then in how many days B alone will do the same work?