Question
If Pawan can do a piece of work in 6 days and Mantu can
complete the same work in 2 days, then in how many days will both of them together complete the work?Solution
If Pawan can complete a piece of work in 6 days (P = 1/6) Mantu can complete the same work in 2 days (M = 1/2) Then working together, they can finish (2/3) of the work in one day (P + M = 2/3) Using the formula {time × rate of work = work done} we find that they will complete the entire work in (3/2)days or 1½ days when working together
Which of the following statement(s) is/are true?
I. During inhalation ribs move out
II. During exhalation ribs move in
What is the name of the reaction in which acid reacts with base to form salt and water?
The membrane surrounding the cell is called
Which polymer is used in the production of bullet-proof materials?
Which part of the flower is responsible for producing pollen?
When heated with chloroform, secondary amines and tertiary amines
A conducting sphere of radius R carries a charge Q. If half of the charge is transferred to an identical uncharged sphere brought into contact and remov...
Which colour is the complementary colour of yellow?
A battery of emf 12 V and internal resistance 4 ohm is connected to a resistor. If the current in the circuit is 0.6 A, what is the resistance of the re...
The electrical conductivity of a semiconductor increases with rise in temperature because: