Start learning 50% faster. Sign in now
Get Started with ixamBee
Start learning 50% faster. Sign in nowTime taken by B to complete the work = 15 – 6 = 9 days Let the total work = 45 units Efficiency of A = 45/15 = 3 units/day Efficiency of B = 45/9 = 5 units/day Required time taken = 0.80 x 45/(3+5) = 4.5 days
The symbol for irradiated foods is called:
The chemical name of vitamin B6 is
Match the following Enzymes with their respective application A to D:
1. Pectinase A. Cheese & curd
2. ...
Lyophilization is synonymous with:
O₂ requirement for Apple storage in Controlled Atmosphere (CA) is:
Which out of the following is a non-reducing sugar?
Emission of ethylene during transportation of cut flowers causes a disorder called:
During malting, barley and other grains are broken down by:
Which statement is true about bacterial spore?
___________is used to sterilize package in aseptic packaging.