Get Started with ixamBee
Start learning 50% faster. Sign in now
Let the edge length of the cube = ‘a’ metres Then, volume of the cube = a3 = 2744 So, a = 2744(1/3) = 14 So, total surface area of the cube = 6a2 = 6 × 142 = 1176 m2 So, cost of painting the cube = 1176 × 7.5 = Rs. 8820
[(4√ (7) +√ (7))× (7√ (7) + 6√ (7))] - 87 = ?
...Simplify:
Find the value of the following expression:
372 ÷ 56 × 7 – 5 + 2
(75 + 0.25 × 10) × 4 = ?2 - 14
(1/5)(40% of 800 – 120) = ? × 5
(15 × 16) + 242= ? × 16
72 + 122 - 25% of 600 = ?
535 + ? × 27 - 22 × 20 = 230