Start learning 50% faster. Sign in now
Tata Power Renewable Energy has secured a deal with Mumbai's Vivarea Condominium to make it the country's first housing society to operate a captive solar energy plant for residential consumption. To power the society, a 3.125-megawatt solar facility will be built in Maharashtra's Himayatnagar by Tata Power subsidiary. It will supply green electricity at 40% less than the current cost.
Did you knew that the radio is ranked number two in the list of ‘101’ Gadgets that changed the World’s according to History Channel?
Directions: In each of the questions, a sentence has been divided into four parts, one of which may contain an error. Identify that fragment and mark ...
I found it difficult to removed (a) / the chewing gum that (b) / stuck to my cap (c) / No Error(d)
The concept of conservation (1)/ should be a way of life as has been practiced (2)/ in India by the Adivasis - tribals who live on the periphary(3)...
After the ache in the neck from grazing upwards at these alluring frescoes, we sat down for a while, rubbing our necks, in the splendid dance hall with ...
this week since February 2018 / companies adding 18 oil rigs this week / U.S. energy firms added the most oil rigs / producers have been reducing spendi...
Parts of the following sentence are given as options. Identify the segment that contains a grammatical error.
Ramprasad has not been able to co...
He insisted that the report (1)/ should be submitted by the (2)/ end of the week to ensure (3)/ that there are no further delays (4)/ no error (5)
Given below is a sentence with or without an error. The error, if any, is in one part of the sentence. Choose the correct part which contains the error...