Question
A task can be completed in 15 days when Akash and Bittu
work together. Akash is 30% more efficient than Bittu. If both started the task separately and Akash stopped after working for 10 days, how many additional days would Bittu require to finish the remaining work?Solution
ATQ,
Let the efficiency of 'Bittu' be 'x' units/day So, efficiency of 'Akash' = x × 1.3 = '1.3x' units/day So, total work = (1.3x + x) × 15 = '34.5x' units Work done in 10 days = 10 × (1.3x + x) = '23x' units So, work remaining = 34.5x - 23x = '11.5x' units So, time taken by 'Bittu' to finish the remaining work = 11.5x ÷ x = 11.5 daysÂ
The time period of a second’s pendulum is –
Which lens is used to correct myopia (shortsightedness)? Â
Which phenomenon does a hologram use to create an image?
Which of the following vitamins are called fat-soluble vitamins?
What is the speed of sound in air at room temperature (20°C)? Â
The force of attraction between two masses is called — Â
The experimental evidence that the electron exhibits wave-like characteristics was first provided by:
A body explodes into three equal fragments, two of which fly off perpendicular to each other with equal speeds. What is the direction of the third frag...
The Pointing vector of electromagnetic waves has the same dimensions as that of:
When a cannonball is fired, its motion is an example of ______.