Question
A can do a work in 45 days and the same the work is
done in 15 days by A and B together, then in how many days B can complete the 20% of work?Solution
A takes 45 days A and B together takes 15 days LCM of 45 and 15 = 45 units Efficiency of A = 45/45 = 1 Efficiency of A and B = 45/15 = 3  So, efficiency of B = 3 – 1 = 2 B does 20% of the total work. Then, 20% of 45 = 9 units So, B will take 9/2 = 4.5 days to complete the work.
Consider the following statements:
1. Prime Meridian passes through Greenwich and is at 0° Longitude.
2. International Date Line, on...
Who discovered electron ?
A rectangle has an area 30 cm 2 and perimeter 26 cm. its length (in cm) is
Which state or union territory received the GI tag for Basholi painting?
The average age of A, B and C is 28 years, while the average age of B, A and D is 24 years. If the ratio of the age of C and D is 5:3, respectively, the...
A man deposited 40% of his salary to a bank which offers compound interest at the rate of 10% p.a. If the interest earned by him from the bank after 2 y...
If ‘I’ stands for ‘+’, ‘J’ stands for ‘×’, ‘K’ stands for ‘÷’, and ‘L’ stands for ‘−’, what will come in place of th...
How many seconds will a train 62 m in length, travelling at the rate of 45 km an hour, take to pass another train 85 m long, proceeding in the same dire...
Which of the following is NOT a renewable energy source?
Which of the following is not a type of equity?