A can do a work in 45 days and the same the work is
done in 15 days by A and B together, then in how many days B can complete the 20% of work?Solution
A takes 45 days A and B together takes 15 days LCM of 45 and 15 = 45 units Efficiency of A = 45/45 = 1 Efficiency of A and B = 45/15 = 3  So, efficiency of B = 3 – 1 = 2 B does 20% of the total work. Then, 20% of 45 = 9 units So, B will take 9/2 = 4.5 days to complete the work.
Last month, the pre-induction trials were put of by two weeks due to bad weather alerts.
The project was a wild goose chase , and we ended up wasting a lot of time and resources.
In each sentence, some portion is in bold, which may or may not need improvement. Choose the correct replacement for that portion that makes the senten...
In the sentence given below four words have been printed in bold which are numbered (1), (2), (3) and (4) One of these words may be misspelt or inappro...
- Select the option that corrects the error in the given sentence.
He behaved very rude during the meeting. The following question contains three statements, one or more of which may not be grammatically correct. You are required to identify the incorrect sta...
The political retoric of foreign aggression is backed up by very brisk policing at home.Â
...At the same time, as lead players in the growth endeavour, businesses also must prioritise certain actions to align with emerging challenges faced by th...
In the following sentence, four words or phrases have been highlighted. One of them is incorrect. Choose the INCORRECT word or phrase from the given opt...
The plots and hindrances were such that anyone would have been torn between blaming the parents or sympathizing for them.