Question
A can complete a work in 15 days, and B can complete the
same work in 20 days. If they work together for 6 days, what fraction of the work is left?Solution
Work done by A in 1 day = 1/15 Work done by B in 1 day = 1/20 Work done by A and B together in 1 day = (1/15 + 1/20) = 7/60 Work done in 6 days = 6 Ă— 7/60 = 7/10 Fraction of work left = 1 - 7/10 = 3/10 Correct answer: d
- What is the name of the technology that provides a secure and encrypted connection over an untrusted network?
Two points A and B are located such that the distance between them is 100 meters. If point A is at the origin and point B is at an angle of 30 degrees f...
Solve log₂(x–1) + log₂(x+3) = 3.
The combined current ages of Ram and Shyam add up to 56 years. Four years from now, the age ratio of Ram to Shyam will be 3:5. Determine the age differe...
A container holds a mixture of juice and water in the ratio of 5:2. When 6 liters of juice are added to the mixture, the ratio of...
The probability of a student solving a problem correctly is 0.6. Out of 10 independent attempts, what is the probability that he solves at least 8 ?
Given a mixture of 234 liters consists of water and milk in the ratio of 21:5. If 1/2 of this mixture is removed and replaced wit...
Quantity I: The distance a truck travels from point P to point Q, given that a bike covers the same distance in 2 hours. The tru...
A person is standing 30 meters away from the base of a building. If the angle of elevation from the person's eye level to the top of the building is 60 ...
In an election between two candidates, the winning candidate secured 25% more votes than the losing candidate. If the winner rece...