Question
A, B, and C together can do a work alone in 12 days, 18
days, and 54 days respectively. A alone starts the work and work for 3 days and leaves the work, then B alone does the work for 8 days and leaves the work. If remaining work is done by C alone then for how many days has C worked?Solution
Total work = LCM of 12, 18 and 54 = 108 units Unit per day of A = 108/12 = 9 Unit per day of B = 108/18 = 6 Unit per day of C = 108/54 = 2 Units of work done by A in 3 days = 9 × 3 = 27 units Units of work done by B in 8 days = 8 × 6 = 48 units Remaining work = 108 – (27 + 48) = 33 units So, C has worked for 33/2 = 16.5 days
The Blind river dolphins are found in the water of:
The Dada Saheb Phalke Award for 2011 was won by
A certain logic has been followed in written the number below the line in each block. Follow the same logic to choose the correct number at the space be...
Which incident led Gandhi ji to with draw non-cooperation movement?Â
Sum of the two numbers is 6 times their difference. Then the numbers are in the ratio.
Consider the following statements :
1.     A strait is a narrow passage of water between two landmasses.
2.     The shape of ...
A solid cube of gold is melted and made into smaller cubes of sides half the original. How many such smaller cubes are made?
A ray of light hits a mirror and is reflected. If the mirror rotates by an angle 10° in one direction, then the reflected ray will rotate by
Global warming is believed to be due to:
In two years, half the tiles fall off from a wall. How many years will it be when 75% of the tiles have fallen off?