Question
A can do a certain work in 15 days and B can do
one-third of the same work in 10 days. A and B work together for 6 days and then A leaves. B completes the remaining work with C in 8 days. A and C together can complete the original work inSolution
B can do the work in = 30 days Let us suppose C can do the same work in x days. Now, A and B can do the part of work in 1 day is. Therefore, A and B can do the work together in 10 days, but they only did for 6 days. and the part of work done in 6 days is =6/10 th part of work. Now, The Remaining work = 1-10/ 6 =2/5 th part of work. Now, according to question B and C did the remaining work in 8 days Hence, in 1 day work done by B and C together is = 1/20th part of work Therefore, one day work of B and C together is =1/ 30 +1/x But it is given =1/ 20 as B and C does 2/5th part of work in 8 days
Simplify:
6x + 8y - [(12x + 6y) - (4x + 3y) + 2y] - 4xIf 9x2 + 16y2 = 24xy, then find the ratio of ‘x’ and ‘y’, respectively.
- Suppose [a + (1/16a)] = 3, then the value of [16a³ + (1/256a³)] is:
If, 6x + y = 20, and 2xy = 32, and 6x > y, then find the value of 216x³ – y³.
If x + 1/x = 2, find x⁷ + 1/x⁷.
(x – 6) 2 + (y + 2) 2 + (z – 4) 2 = 0, then find the value of 4x - 3y + z.
Three cubes of metal whose edges are 3cm, 4cm and 5cm. respectively are melted and a single cube is formed. What is the length of the edge of the newly ...
A number is increased by 20%, and the resulting number is decreased by 20%. If the initial number is ₹x, the final number is ₹2880. What is the valu...