Question
P, Q, R can do a piece of work in 40 days, 90 days, and
36 days, respectively. P started the work. Q joined him after 7 days. If R joined them after 8 days from the beginning, then for how many days did R work?Solution
LCM (40, 90, 36) = 360 Let the total work be the LCM of the time taken individually by the workers. Efficiencies, P does each day = 360 40 = 9 units Q does each day = 360 90 = 4 units R does each day = 360 36 = 10 units Let the total work be completed in K days. According to the question, 9 x K + 4 x (K-7) + 10 x (K - 8) = 360 23K= 468 K = 468/23 (K-8) =284/23 Â (K - 8) = 12(8/23)
If the average of two numbers is 13 and the square root of their product is 12, then the difference between the numbers is:
What is the smallest natural number that should be added to 1030 so that the square root of the sum is a natural number?
A horse is tethered to a peg fixed at one corner of a rectangular grass field measuring 45 metres in length and 25 metre...
Determine the value of (0.88)2Â
Find the square root of 0.0324.
Two times a number, added to the square of that number, gives 3. What could be the possible answer for this number?
Find the Square root of √14641
Calculate the lateral surface area of a right circular cone having a radius of 5 cm and a height of 12 cm.
Find the value of ∛ 474552
Solve the following :-