Let capacity of the tank = 18 litres (lcm of 6 and 9) Efficiency of pipe ‘A’ = (18/6) = 3 litres/hour Efficiency of pipe ‘B’ = (18/9) = 2 litres/hour Efficiency of all the three pipes together = (18/4) = 4.5 litres/hour Efficiency of pipe ‘C’ = 4.5 – (3 + 2) = (-0.5) litre/hour {Negative sign shows that pipe ‘C’ is an outlet pipe} Required time taken = {(5/6) × 18)}/0.5 = 30 hours
16 men can complete a work in 10 days. 10 men started the same work and left after working for ‘y’ days. The remaining work is completed by 6 men in...
Rahul can complete a work in 12 days and Ayush in 15 days. If they work together for 3 days, then the fraction of work that will be left is:
A and B can complete a work together in 18 days. If A alone can complete one-third of the work in ‘x’ days and remaining work is completed b...
Puneet and Qureshi together can complete (7/8)th of a piece of work in 9 days, Qureshi and Rohit together can complete (3/5)th of the work in 8 days and...
'Zara' is capable of finishing a specific task in 60 days. On the other hand, 'Armaan' takes 40% more time than 'Zara' to complete the same task, while ...
Ratio of the work done by P, Q and R in one day is 7:3:8 respectively. They all together can complete the work in 42 days. Q and R worked on it for 21 d...
X, Y and E can do piece of work in 24, 30 and 40 days respectively. All three began to work together but X and Y left 6 and 8 days respectively before c...
A alone can complete 40% of a work in 18 days while B takes 15 days more than A to complete it. If B and C together can complete the work in 20 days, th...