Question
In a company, 70% of the employees are in the
engineering department, and the rest are in the marketing department. 50% of the engineering employees and 30% of the marketing employees have received performance bonuses. If the number of employees who did not receive performance bonuses is 350, find the total number of employees in the company.Solution
ATQ, Let the total number of employees be ‘y’. According to the question, (0.5 × 0.70y) + (0.7 × 0.30y) = 350 Or, 0.35y + 0.21y = 350 Or, 0.56y = 350 Or, y = 350 / 0.56 = 625 The total number of employees in the company is 625.
If the perimeter of a square is 40 cm, what is the length of each side?
In the given figure, O is centre of the circle. Circle has 3 tangents. If ∠ QPR = 45 0 , then what is the value (in degrees) of ∠ QOR ?
Orthocenter of an right angle triangle lies on
The measure of an angle is one-third of its supplementary angle. Find its measure.
In the given figure. ‘O' is the centre of the circle and ∠BCA = 50°. The value of ∠BDA is:
The radius of the incircle of a triangle is 3 cm. if the area of the triangle is 12 cm 2 , then its perimeter is?
The length of the each side of an equilateral triangle is 7√3 cm . The area of circumcircle, (cm 2 ) is
- ABCD is cyclic quadrilateral in which A = 72º and B = 105º What is the difference between the measures of C and D?
If in a ΔABC, AD is internal angle bisector & D is a point on BC, AB = 6cm, BC = 9cm then what is BD:CD?