Question
A can complete a piece of work in 12 days and B can complete the same work in 18 days. In how many days can they together complete 5/6 of the work?
More Mixture Questions
- From a cask filled with wine, 108.75 liters are first drawn and replaced with water. From this mixture 87 liters are drawn and replaced with water. The rat...
- 150 litres of mixture ‘A’ has 90 litres milk and rest water. Find the total quantity of mixture ‘B’ if it contains 20% more milk and 20% less water than mi...
- The cost price of watermelon juice in flask F is Rs. 55 per liter, and the cost price of watermelon juice in flask I is Rs. 40. When the watermelon juice i...
- ‘x’ litres of mixture ‘A’ contains milk and water, only in the ratio of 6:5, respectively. 90 litres of mixture ‘B’ contains 25% more water than milk in it...
- The ratio of alcohol and water in a container is 3:7. If 4 litre of alcohol added in it, the ratio of alcohol to water becomes 5:7. Find the initial quanti...
- A 400 litre mixture of water and acid contains 80 litres more water than acid. If 40% of the mixture is removed and then ‘k’ litres of acid is added, then ...
- 180 litres of a mixture contains 36% milk and rest water. If ‘x’ litres of milk is added into the mixture then quantity of water in the final mixture becom...
- A container holds a mixture of two liquids, A and B, in the ratio 2:3. If the total volume of the mixture is 70 liters, how many liters of liquid A must be...
- Mixtures A and B have milk and water in ratio 3:5 and 2:3 respectively. 40 ml from A and 45 ml from B are mixed. Find the percentage of water in the final ...
- A container contains 720 litres of oil and kerosene mixed in the ratio 5:7. If ‘z’% of the total mixture is removed, and the amount of kerosene removed is ...
Relevant for Exams:
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt