Question
The area of a square is 225 cm². The breadth of a
rectangle is 20% more, and the length is 50% more than the side of the square. Find the ratio of the area of the square to the area of the rectangle.Solution
Area of square = 225 cm², Side of square = 15 cm Area of rectangle = (l x b) Length = (15 x 1.5 = 22.5) cm Breadth = (15 x 1.2 = 18) cm Area of rectangle = (22.5 x 18 = 405) cm² Required ratio = 225/405 = 5/9 = 5:9
- Suman alone can complete a work in 40 days. Pooja is twice as efficient as Suman. Find the percentage of work completed by Suman and Pooja together in 8 da...
A and B can complete a task together in 16 days, while B alone takes 32 days to finish it. A began working alone and left after ‘x’ days, after whic...
A cheetah can catch a deer running with a speed of 108 km/h and is 66 meters ahead of it, in 12 seconds. Find the time taken by the cheetah to catch a z...
A robot can finish a task as quickly as two humans, 'E' and 'F', together. If human 'E' can finish the task in 8 hours and human 'F' in 24 hours, how lo...
If 6 men and 5 boys can complete a piece of work in 9 days, while 24 men and 20 boys can complete the same work in 3 days, how long will it take for 12 ...
'Y' is 36% less efficient compared to 'X'. If 'X' requires 86.4 days to finish a task, determine how many days 'Y' will take to complete the same task.
‘A’ alone can complete a work in 10 days. ‘B’ alone can complete the same work in 20 days. If ‘A’ and ‘B’ work together for 3 days, then...
‘A’ and ‘B’ alone can do a certain work in 30 days and 40 days, respectively. Both started the work together but after ‘x’ days ‘A’ left...
G' can complete (3/4) of a job in 24 days, while 'G' and 'H' together can complete the same job in 16 days. Find the time taken by 'H' to complete 25%...
‘A’ and ‘B’ can complete a certain work in 13 days and 26 days, respectively. They started working together and worked till completion of the wo...