Question
A and B together can complete a work in 12 days. B and C together can complete the same work in 15 days, and A and C together can complete it in 20 days. How long will it take for A, B, and C to complete the work if all three work together?
More Alligation Questions
- At what time was the temperature the lowest?
- One type of liquid contains 15% of benzene, the other contains 20% of benzene. A can is filled with 6 parts of the first liquid and 4 parts of the second l...
- A fox chases a lion. Fox takes 7 leaps for every 5 leaps of the lion and the distance covered by lion in 6 leaps is equal to the distance covered by fox in...
- AD is the median of triangle ABC. P is the centroid of triangle ABC. If AP = 14 cm, then what is the length of PD?
- A man sold one shirt and one t-shirt for Rs. 4000 on shirt he gained 21% and he lost 14% on t-shirt. If overall profit is 7%, then cost price of t-shirt is
- The Jar contains only 8 litres of milk and the rest is water. A new mixture in which concentration of milk is 30%, is to be formed by replacing the Jar mix...
- Length and breadth of a rectangular field is (x + 5) cm and (x – 4) cm, respectively. If the cost of ploughing the field at a rate of Rs. 7 per cm² is Rs. ...
- In jar 1, 280 litres of milk was mixed with 50 litres of water. Some of the mixture was taken out from Jar 1 and put into Jar 2. When 36 litres of milk was...
- The cost of type 1 sugar is Rs 22 per Kg and type 2 sugar is Rs 28 per Kg. If both type1 and type 2 are mixed in the ratio of 1:2,then the price per Kg of ...
- A shopkeeper has 68 kg rice a part of it, he sells at the profit of 44% and rest at loss of 24% and he get the loss of 16% so what is the quantity sold at ...
Relevant for Exams:
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt