Question
When is the first prototype of the Advanced Medium
Combat Aircraft (AMCA) expected to be ready?Solution
The first prototype of the Advanced Medium Combat Aircraft (AMCA) is expected to be ready by 2028-29, with production to start by 2032-33 and induction targeted for 2034.
Water flows into a tank having the dimensions of its base given as 200 m × 150 m through a rectangular pipe having dimensions given as 1.5 m × 1.25 m ...
How many triangles are there in the figure given below?
What is the shortcut key to find and replace options in excel ?
Under the Payment of Wages Act, 1936, what is the maximum amount that can be deducted from an employee’s wages as a penalty?
Two trains of same length are running in parallel tracks in the same direction with speed 65 km/hr and 95 km/hr respectively. The latter completely cros...
Which of the following means “by what authority”?
Consider the following financial instruments:
1. Cash management bills
2. Sovereign gold bonds
3. Collateralized borrowing and ...
Average run scored by a batsman in 26 innings is 80. In next 6 innings, he scored runs with an average of ‘x’ so that his overall average increases ...
The United Nations Millennium goals were extended to which year?