Question
Who among the following persons is getting into the
lift-1 and lift-2 respectively on floor number three? Study the following information carefully and answer the below questions There are four floors in an apartment with two lifts Viz., Lift-1, and Lift-2. Lift-1 is to the west of Lift-2. Eight persons-AMAN, ANKIT, ARUN, ARJUN, ARYAN, ASHOK, ASHISH, and ASHWANI are using these two lifts to reach certain floors of the apartment but not necessarily in the same order. The lowermost floor is numbered as 1 and the floor above is numbered as 2 and so on, No two persons use the same lift on the same floor. Only one floor is between AMAN and ASHISH, both are using the same lift. Neither ANKIT nor ARJUN using the lift on the same floor of ARUN. ARJUN is getting into the lift immediately above ASHWANI’s lift. Both ARUN and ARYAN are using the same lift, ARYAN gets in above ARUN. Either ARJUN or ASHWANI is getting into the lift on the same floor of AMAN. ASHOK does not get into the lift on an odd numbered floor. AMAN is getting into the lift on an even numbered floor but not an even numbered lift.Solution
AMAN is getting into the lift on an even numbered floor but not an even numbered lift. Only one floor between AMAN and ASHISH, both are using the same lift. From the above condition, there are two possibilities .
ARJUN is getting into the lift immediately above ASHWANI’s lift. Either ARJUN or ASHWANI is getting into the lift on the same floor of AMAN. From the above condition, there are three possibilities.
ASHOK does not get into the lift on an odd numbered floor. Both ARUN and ARYAN are using the same lift, ARYAN gets in above ARUN.
Neither ANKIT nor ARJUN using the lift on same floor of ARUN From the above condition, Case1 and case2a were dropped. 
Two efficient workers or three non-efficient workers can complete a certain task in 20 days. If each efficient worker improves their efficiency by 33(1/...
P and Q can complete a work in 28 days and 42 days, respectively. P, Q and R together can complete the work in 14 days. If R get a total wage of Rs. 546...
14 boys can do a work in X days and 22 girls can do the same work in (X + 10).The ratio of work done by 7 boys and 9 girls in the same time is in the ra...
A and B together can complete a job in 2 days. A alone takes x + 6 days to complete the job, while B alone takes x + 24 days to complete the same job. <...
If 12 men working 12 hours a day can make 12 quilts in 12 days, then in how many days 24 men working 24 hours per day will make 24 quilts?
A and B together can complete a work in 10 days. B and C together can do it in 12 days, and A and C together can do it in 15 days. In how many days will...
- 50 workers working 6 hours a day take 18 days to complete a task. How many workers working for 5 hours a day are needed to complete four times the given ta...
The efficiency of X is 50% of the efficiency of Y. If Y can type 180 pages in 45 days, then find the number of days taken by X alone to type 360 pages.
3 men, 4 women and 5 boys can do a piece of work in 15 days, 20 days and 25 days respectively. For first 3 days 3 men and 2 women work together and for ...
Anmol can do a piece of work in 30 days, Bineet can complete double the work in 90 days and Chintu can do the work in 60 days. If all of them jointly ge...