Question
What is the position of the box with red?
Answer the questions based on the information given below. Seven boxes viz. A, B, C, D, E, F and G are filled with different colours viz. Pink, Red, Green, White, Black, Yellow and Blue are kept one above another in a stack. The box kept at the lowermost position is numbered as 1 and the box kept at the topmost position is numbered as 7. Box F is kept four boxes above the box with yellow where the box with black is kept exactly in the middle between them. Only two boxes are kept between the box with black and box E which is not kept at the topmost position. As many boxes kept above box E as below the box with Blue which is kept two boxes away from box D. Box G with white is kept at an odd numbered position. Box C is kept immediately above the box with red and two boxes below box B. The box with pink is kept immediately below the box with green.Solution
Box F is kept four boxes above the box with yellow where the box with black is kept exactly in the middle between them. Only two boxes are kept between the box with black and box E which is not kept at the topmost position.
As many boxes kept above box E as below the box with Blue which is kept two boxes away from box D. Box G with white is kept at an odd numbered position.
Box C is kept immediately above the box with red and two boxes below box B. The box with pink is kept immediately below the box with green. Hence, cases 1 and 3 get eliminated.
So final arrangement- 
Working alone, 'C' can complete a job in 30 days. 'D' takes 20% less time than 'C' to finish the same job. Calculate the percentage of work done by 'C' ...
- If Riya takes three times the time that Mahi takes or four times the time that Neha takes to finish a task, and all three working together can complete it ...
- Pipes X and Y can fill a water tank individually in 24 minutes and 36 minutes, respectively. A third pipe Z can empty the tank in 72 minutes. If all three ...
A can complete a piece of work in 24 days. He worked for 21 days and then B finished the remaining work in 6 days. In how many days can A and B finish t...
A can complete a piece of work in 10 days , and B can complete the same work in 15 days . They start working together, and after some days A leaves....
The ratio of time taken by P, Q and R to complete work alone is 4:6:3 respectively. If all three together complete the work in 8 days, then find in how ...
18 women can do piece of work in 12 days. 12 men can do the same piece of work in 9 days. Find in how many days will 8 men and 8 women complete that work?
A and B together, B and C together and A and C together can complete a piece of work in 14 days, 15 days and 18 days respectively. Find the ratio of the...
Q can do a work in 15 days and R can do the two-third work done by P and Q together in a day. If R completes the work in 18 days, how many days will it ...
A' can finish a job in 24 days, while 'B' is 25% less efficient than 'A.' If they take turns working, beginning with 'A,' how many days will it take for...